Phone 480-437-9900

480-437-9900
Home » Projects

Projects

Transportation CADD Services continues to support the demand for high quality industry specific technical CADD services. Our typical projects range in size from four drawings to over two hundred drawings each.

Below is a partial list of projects we have completed.

1994, 1995, 1996, 1997, 1998, 1999, 2000, 2001, 2002, 2003, 2004, 2005, 2006, 2007, 2008, 2009, 2010, 2011, 2012

1994

SR 179 AND BELL ROCK BOULEVARD
ADOT PROJECT: # S-238-511
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

SR 188 SLATE CREEK SECTION
ADOT PRESCOTT: # PLH-038-1(19)
SCOPE OF WORK: Traffic Control Plans for Roadway Realignment

I-17 AND SR 260 TRAFFIC INTERCHANGE
ADOT PROJECT: # S-326-514
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

I-40 AND COUNTRY CLUB ROAD TRAFFIC INTERCHANGE
ADOT PROJECT: # I-40-4507
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

LAKE VALLEY SCHOOL ROAD AND FLORENTINE ROAD TRAFFIC INTERCHANGE
TOWN OF PRESCOTT VALLEY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

SR 95 PARKER STREETS AND PORT OF ENTRY
ADOT PROJECT: # F-063-2-515
SCOPE OF WORK: Pavement Marking, Signing and Traffic Control Plans

SR 69 AND LEE BOULEVARD
CITY OF PRESCOTT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

SR 69 AND LAKE VALLEY SCHOOL ROAD
ADOT PROJECT: # F-029-1-520
SCOPE OF WORK: Traffic Signal, Pavement Marking and Signing Plans

SR 69 AND NAVAJO DRIVE
ADOT PROJECT: # F-029-1-521
SCOPE OF WORK: Traffic Signal, Pavement Marking and Signing Plans

SR 69 AND WIND SONG ROAD
ADOT PROJECT: # F-029-1-522
SCOPE OF WORK: Traffic Signal, Pavement Marking and Signing Plans

SR 77 LITTLE COLORADO BRIDGE
ADOT PROJECT: # F-27-1-528
SCOPE OF WORK: Traffic Control Plans

SR 82 AND SONOITA COUNTY LINE
ADOT PROJECT: # STP-275(7)
SCOPE OF WORK: Pavement Marking, Signing and Traffic Control Plans

US 60 AND SR 260-SHOWLOW
ADOT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

SR 66 AND ARMOUR AVENUE – KINGMAN
ADOT PROJECT:# M-951-4-505
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

US 89 AND CARLETON STREET
ADOT PROJECT: # F-025-1-528
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

US 93 AND M.P. 59 TO WASH BRIDGE
ADOT PROJECT: # STP-039-1(31)
SCOPE OF WORK: Pavement Marking and Signing Plans

US 95 AND AVENUE 3E
ADOT PROJECT: # F-063-1-527
SCOPE OF WORK: Traffic Signal Modification and Traffic Control Plans

CENESEE AVENUE AND EAST GATE MALL
SAN DIEGO, CALIFORNIA PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

JAMACHA ROAD AND CARDIFF STREET AND SKYLINE DRIVE
SAN DIEGO, CALIFORNIA PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

ADRIAN STREET AND RUE D’ ORLEANS AT WEST POINT LOMA BOULEVARD
SAN DIEGO, CALIFORNIA PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

LAUREL STREET AND INDIA STREET
SAN DIEGO, CALIFORNIA PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

TURQUOISE STREET AND MISSION BOULEVARD AT LA JOLLA MESA DRIVE
SAN DIEGO, CALIFORNIA PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

CAMELBACK ROAD AND 32ND STREET
CITY OF PHOENIX PROJECT: # 94726
SCOPE OF WORK: Traffic Signal Modification Plans

PORT OF ENTRY SIGNING CONCEPT FOR NON-FREEWAYS
ADOT PROJECT: # 00-XXX-000
SCOPE OF WORK: Permanent Signing Plans

SR 264 BURNSIDE JCT. – GANADO
ADOT PROJECT: # F-060-1-519
SCOPE OF WORK: Pavement Marking Plans

SR 95 NEEDLES – MARINA
ADOT PROJECT: # 00-XXX-000
SCOPE OF WORK: Pavement Marking and Signing Plans

EAST "H" STREET AND AVILA WAY
CHULA VISTA PROJECT: # 94-170
SCOPE OF WORK: Traffic Signal Modification Plans

EAST "H" STREET AND PASEO DEL REY
CHULA VISTA PROJECT: # 94-171
SCOPE OF WORK: Traffic Signal Modification Plans

I-10 PRINCE ROAD TO JCT. I-19
ADOT PROJECT: # 00-XXX-000
SCOPE OF WORK: Mainline Signing Concept Plans

BUSINESS 8 AND ARABY ROAD
ADOT PROJECT: # S-579-505
SCOPE OF WORK: Traffic Signal, Pavement Markings and Pavement Replacement Plans

US 95 AND 14TH AVENUE (YUMA)
ADOT PROJECT: # F-063-1-529
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

LAKE HAVASU AVENUE AND SWANSON AVENUE
LAKE HAVASU PROJECT: # ST-199-95
SCOPE OF WORK: Traffic Signal Plans

LAKE HAVASU AVENUE AND MESQITE AVENUE
LAKE HAVASU PROJECT: # ST-199-95
SCOPE OF WORK: Traffic Signal Plans

RECONSTRUCTION PROJECT McCULLOCH BOULEVARD AND RIVIERA BOULEVARD
LAKE HAVASU PROJECT: # ST-188-93
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

PRODUCTION WELL P-1
FALCON VALLEY PROJECT: # B.102
SCOPE OF WORK: P-1 As-Built Diagrams

REPLACEMENT WELL NO. 50
CITY OF SCOTTSDALE PROJECT: # B.071
SCOPE OF WORK: Well 50 As-Built Diagrams

^ Top

1995

GLASSFORD HILLS ROAD AND FLORENTINE ROAD
TOWN OF PRESCOTT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

GLASSFORD HILLS ROAD AND LONG LOOK ROAD
TOWN OF PRESCOTT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

B-19 AND HELMET PEAK AT SAHURITA ROAD
ADOT PROJECT: # S-587-503
SCOPE OF WORK: Traffic Control, Curb and Sidewalk Construction plans

I-40 ASHFORK – COCONINO COUNTY LINE
ADOT PROJECT: # IM-40-2(115)
SCOPE OF WORK: Pavement Marking and Traffic Control Plans

I-40 PERKINS VALLEY – HOLBROOK
ADOT PROJECT: # IM-40-4(148)
SCOPE OF WORK: Ramp Closure and Detour Plan

ROBERT ROAD AND YAVAPAI ROAD
TOWN OF PRESCOTT VALLEY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

ROBERT ROAD AND FLORENTINE ROAD
TOWN OF PRESCOTT VALLEY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

ROBERT ROAD AND LOOS DRIVE
TOWN OF PRESCOTT VALLEY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

ROBERT ROAD AND WARREN ROAD
TOWN OF PRESCOTT VALLEY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

SR 73 AND JCT. SR 60-M.P. 324.0
ADOT PROJECT: # 215 (3)P
SCOPE OF WORK: Pavement Marking, Signing and Traffic Control Plans

SR 95 AND ARIZONA AVENUE
ADOT PROJECT: # F-063-2-521
SCOPE OF WORK: Pavement Marking and Signing Plans

SR 89 AND WILLOW LAKE ROAD
ADOT PROJECT: # F-025-2-5I7
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

JCT. SR 85S AND JCT. I-10
ADOT PROJECT: # 023-1(23)P
SCOPE OF WORK: Pavement Marking Plans

THORNYDALE ROAD AND HORIZON HILLS DRIVE
PIMA COUNTY PROJECT: # 4TT0GI
SCOPE OF WORK: Traffic Signal Plans

SOUTHERN AVENUE INTRERCEPTOR AT PRIEST DRIVE
CITY OF TEMPE PROJECT: # 25650
SCOPE OF WORK: Traffic Control Plans

^ Top

1996

GURLEY STREET AND BRADSHAW DRIVE
CITY OF PRESCOTT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

I-8 FORTUNA WASH BRIDGE
ADOT PROJECT: # I-8-1-515
SCOPE OF WORK: Traffic Control Plans

I-10B AND PARK AVENUE AT VALENCIA
ADOT PROJECT: # 951-1503
SCOPE OF WORK: Pavement Marking and Traffic Control Plans

SR-51 SQUAW PEAK EXTENSION – SHEA BOULEVARD TO THUNDERBIRD
ADOT PROJECT: # 600-2-514
SCOPE OF WORK: Pavement Markings, Signing, Guide Sign Design and Sign Structure Plans

WINDSONG AND FLORENTINE
TOWN OF PRESCOTT VALLEY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

ROBERT ROAD AND SPOUSE
TOWN OF PRESCOTT VALLEY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

WINDSONG AND HIGHWAY 69
TOWN OF PRESCOTT VALLEY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

I10 AND QUEEN CREEK ROAD TRAFFIC INTERCHANGE
ADOT PROJECT: # 10-3-302
SCOPE OF WORK: Traffic Signal, Pavement Marking and Signing Plans

US 95 AND SOMERTON AVENUE
ADOT PROJECT: # F-063-1-534
SCOPE OF WORK: Traffic Signal, Pavement Replacement, Pavement Marking and Signing Plans

US 95 AND SOMERTON AVENUE
ADOT PROJECT: # F-063-1-534
SCOPE OF WORK: Traffic Signal, Pavement Replacement, Pavement Marking and Signing Plans

MCDOWELL ROAD AND RIDGECREST STREET
CITY OF MESA PROJECT: # 95854
SCOPE OF WORK: Traffic Signal and Signing Plans

DESERT HILLS DRIVE TO 40TH STREET RECONSTRUCTION
CITY OF YUMA PROJECT: # 5.8213
SCOPE OF WORK: Pavement Marking and Signing Plans

ATLANTIC BOULEVARD IMPROVEMENT PROJECT
CITY OF COMMERCE CALIFORNIA PROJECT: # 6898
SCOPE OF WORK: Civil, (4) Traffic Signals, Construction Sequencing, Pavement Markings, Signing and Cantilever Structure Plans

SR-B19 AND FRANK REED ROAD
ADOT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal, Pavement Marking and Signing Plans

INA ROAD AND THORNYDALE ROAD
PIMA COUNTY PROJECT: # 4TTOGI
SCOPE OF WORK: Traffic Signal Plans

SR 260 PENROD LANE, PINETOP
ADOT PROJECT: # O44-1(17)
SCOPE OF WORK: Civil Roadway Improvements, Pavement Markings and Signing Plans

SR-95 NOTLED BILL WILLIAMS RIVER
ADOT PROJECT: # 063-2(19)P
SCOPE OF WORK: Pavement Marking and Traffic Control Plans

US 160 JCT. INDIAN ROUTE 59
ADOT PROJECT: # 064-1-514
SCOPE OF WORK: (Metric) Pavement Marking Plans

^ Top

1997

SR 89A AND WOODLANDS VILLAGE BOULEVARD
ADOT PROJECT: # S-366-538
SCOPE OF WORK: Traffic Signal, Pavement Markings, Signing and Pavement Replacement Plans

SR 101L PIMA FREEWAY JCT. I-17 TO 56th STREET
ADOT PROJECT: # STP-600-1(6)P
SCOPE OF WORK: (Metric) (3) Traffic Signals at 15th Avenue,16th Street And 7th Avenue Traffic Interchanges

MARINA STREET AND GURLEY STREET
CITY OF PRESCOTT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

BUCKEYE CURVE – VAN BUREN
ADOT PROJECT: # IR-17-1(328)
SCOPE OF WORK: Pavement Marking and Traffic Control Plans

101L – 90TH STREET TO CURRY ROAD
ADOT PROJECT: # RAM-600-1-346
SCOPE OF WORK: Traffic Control Plans

INTERSECTION RURAL ROAD AND ERIE STREET AND INTEL DRIVEWAY
CITY OF CHANDLER PROJECT: # ENR 97-0175
SCOPE OF WORK: Traffic Signal Plans

I-10 AND FLORENCE BOULEVARD TRAFFIC INTERCHANGE
ADOT PROJECT: # 1-10-3-531
SCOPE OF WORK: Traffic Signal, Pavement Marking, Signing and Traffic Control Plans

SR95 AND BULLHEAD CITY
ADOT PROJECT: # 00-XXX-000
SCOPE OF WORK: Time Space Diagrams for AM, Noon and PM

DIVISION STREET AND WHIPPLE STREET
CITY OF PRESCOTT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

SR 202 (STA. 1060+00 – STA. 1073+00)
ADOT PROJECT: # 600-2-514
SCOPE OF WORK: Pavement Marking and Signing Plans

I40 DEVIL DOG TRAFFIC INTERCHANGE – EAST WILLIAMS TRAFFIC INTERCHANGE
ADOT PROJECT: # IM-40-3(84)
SCOPE OF WORK: Pavement Marking Plans

MERIDIAN ROAD – SOUTHERN AVENUE TO UNIVERSITY DRIVE
MARICOPA COUNTY PROJECT: # 68756
SCOPE OF WORK: Signal Interconnect and Pavement Marking Plans

I-17 AVENUE BUREN STREET TO 19TH AVENUE
ADOT PROJECT: # 00-XXX-000
SCOPE OF WORK: Sports Event Signing Plans

I-40 – McCONNICO TO SELIGMAN
ADOT PROJECT: # 40-2(117)
SCOPE OF WORK: Interstate Sign Rehab Plans

US 89 – MONTEZUMA AND GOODWIN STREET
ADOT PROJECT: # 025-1(20)P
SCOPE OF WORK: (Metric) Traffic Signal Plans

US 89 – MONTEZUMA AND WILLIS STREET
ADOT PROJECT: # 025-1(20)P
SCOPE OF WORK: (Metric) Traffic Signal Plans

US 89 – MONTEZUMA AND GURLEY STREET
ADOT PROJECT: # 025-1(20)P
SCOPE OF WORK: (Metric) Traffic Signal Plans

^ Top

1998

ADOT FMS LOOP 202 AND FROM VAN BUREN STREET TO CENTER PARKWAY
ADOT PROJECT: # CM-900-0(157)
SCOPE OF WORK: Freeway Communication System Schematic

ADOT FMS LOOP 202 AND FROM SR 143 TO VAN BUREN STREET
ADOT PROJECT: # CM-900-0(157)
SCOPE OF WORK: Freeway Communication System Schematic

ADOT FMS LOOP 202 AND FROM CENTER PARKWAY TO LOOP 101
ADOT PROJECT: # CM-900-0(157)
SCOPE OF WORK: Freeway Communication System Cabling Schematic

ADOT FMS LOOP 101 AND PRICE ROAD EXPRESSWAY FROM LOOP 202 TO U.S. 60
ADOT PROJECT: # CM-900-0(157)
SCOPE OF WORK: Freeway Management System Plans

ADOT FMS LOOP 101 AND FROM BROADWAY ROAD TO SOUTHERN AVENUE
ADOT PROJECT: # CM-900-0(157)
SCOPE OF WORK: Freeway Communication System Cabling Schematic

ADOT FMS LOOP 101 AND FROM LOOP 202 TO APACHE BOULEVARD
ADOT PROJECT: # CM-900-0(157)
SCOPE OF WORK: Freeway Communication System Schematic

ADOT FMS LOOP 202AND101, RED MOUNTAIN FREEWAY AND PRICE ROAD EXPRESSWAY
ADOT PROJECT: # CM-900-0(157)
SCOPE OF WORK: Freeway Management System Plans

ARIZONA AVENUE AND SAN MARCOS
CITY OF CHANDLER PROJECT: # DT 9903-401
SCOPE OF WORK: Traffic Signal Plans

101L – AGUA FRIA, CAMELBACK – NORTH
ADOT PROJECT: # 600-0524
SCOPE OF WORK: # Traffic Signal Plans

I-17 MOORES GULCH TO BLACK CANYON
ADOT PROJECT: # 17-1(342)
SCOPE OF WORK: Pavement Marking Plans

SR 92 – SR92 AND NACO ROAD
ADOT PROJECT: # 577 (2) P
SCOPE OF WORK: Traffic Signal Plans

SR92 AND SCHOOL TERRACE ROAD
ADOT PROJECT: # 577 (2) P
SCOPE OF WORK: Traffic Signal Plans

I-10 MOUNTAIN VIEW TO PANTANO
ADOT PROJECT: # 10-5(78)
SCOPE OF WORK: Pavement Marking, Signing and Traffic Control Plans

US 60 M.P. 247.9 SMITHS SHOPPING CENTER
ADOT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Modification Plans

I-40B – 4th STREET AND SANTA FE AVENUE
ADOT PROJECT: # 951-6
SCOPE OF WORK: Pole Relocation Plan

US89 AND SILVER SADDLE
ADOT PROJECT: # 037-1-513
SCOPE OF WORK: Traffic Signal Plans

US89 AND RAIL HEAD
ADOT PROJECT: # 89 CN 419
SCOPE OF WORK: Traffic Signal Modification Plans

SR 287 COOLIDGE SPRR OVERPASS NO. 188
ADOT PROJECT: # 055-1(13)
SCOPE OF WORK: Pavement Marking and Signing Plans

COS CCTV – FRANK LLYOD WRIGHT BOULEVARD AND HAYDEN ROAD
CITY OF SCOTTSDALE PROJECT: # COS-T-008R97-001
SCOPE OF WORK: CCTV Pole and Cabinet Configuration Plans

COS CCTV – SCOTTSDALE ROAD AND SHEA ROAD
CITY OF SCOTTSDALE PROJECT: # COS-T-008R97-002
SCOPE OF WORK: CCTV Pole and Cabinet Configuration Plans

SR 143 – BROADWAY TO UNIVERSITY DRIVE
ADOT PROJECT: # 600-3(5)P
SCOPE OF WORK: (METRIC) Sign Bridge, Pavement Markings, Traffic Control and Signing Plans

40th STREET AND ROESER ROAD
CITY OF PHOENIX PROJECT: # 6199
SCOPE OF WORK: (METRIC) Traffic Signal Modification Plans

40th STREET AND ROESER ROAD
CITY OF PHOENIX PROJECT: # 6199
SCOPE OF WORK: (METRIC) Traffic Signal Modification Plans

STANDARD DETAILS
CITY OF PARADISE VALLEY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Circles for Intersections – Bikes on Street

^ Top

1999

ADOT FMS 6a SR 101L – SOUTHERN AVENUE TO GUADALOPE ROAD
ADOT PROJECT: # CM-600-1(15)
SCOPE OF WORK: Freeway Management System Plans (Revisions)

56TH STREET AND DUBLIN LANE
CITY OF CHANDLER PROJECT: # ENR 98-0101
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

COLORADO RIVER – STATE LINE
ADOT PROJECT: # 041-1(4)P
SCOPE OF WORK: Pavement Marking Plans

VMS I-40 – 4 SITES
ADOT PROJECT: # N-900-0-547
SCOPE OF WORK:, VMS and Conductor Schedule Plans

VMS I-40
ADOT PROJECT: # N-900-0-516
SCOPE OF WORK: VMS and Conductor Schedule Plans

VMS I-40, 1-17 – 4 SITES
ADOT PROJECT: # N-900-0-515
SCOPE OF WORK: VMS and Conductor Schedule Plans

VMS I-40, US 60, – 3 SITES
ADOT PROJECT: # N-900-0-558
SCOPE OF WORK: VMS and Conductor Schedule Plans

VMS I-17, SR 69, SR 260, US 93 – 6 SITES
ADOT PROJECT: # N-900-0-560
SCOPE OF WORK: VMS and Conductor Schedule Plans

US 60 PERORA RAILROAD UNDERPASS
ADOT PROJECT: # 022-2(45)P
SCOPE OF WORK: Traffic Control Plans

101L FMS, PRICE, WARNER – FRYE
ADOT PROJECT: # 600-1-(11)B
SCOPE OF WORK: FMS Infrastructure Plans

US 95 AND ARABY ROAD
ADOT PROJECT: # 063-1-540
SCOPE OF WORK: Traffic Signal, Pavement Marking and Signing Plans

I-40 AND STOCKTON HILL ROAD TRAFFIC INTERCHANGE
ADOT PROJECT: # 040 MO 051
SCOPE OF WORK: Traffic Signal Modification Plans

SR 85 – 17TH AVENUE BUCHANAN – VAN BUREN
ADOT PROJECT: # TEA-805-9(1)P
SCOPE OF WORK: Signing and Pavement Marking Plans

47TH STREET AND UNIVERSITY DRIVE
CITY OF PHOENIX PROJECT: 6386
SCOPE OF WORK: Traffic Signal Plans

^ Top

2000

GOODYEAR FIRE STATION NO. 2
CITY OF GOODYEAR PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

GOODYEAR FIRE STATION NO. 3
CITY OF GOODYEAR PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

SR 89A AND 12TH STREET
ADOT PROJECT: # S-A89-A-501
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

SR 64 AND CENTER ROAD
GRAND CANYON NATIONAL PARK:
SCOPE OF WORK: Span Wire Traffic Signal Plans

ELLIOT ROAD AND SYCAMORE PL
CITY OF CHANDLER PROJECT: # ENR 00-0050
SCOPE OF WORK: Traffic Signal Plans

DOBSON ROAD AND MESQUITE STREET
CITY OF CHANDLER PROJECT: # ENR 00-0050
SCOPE OF WORK: Traffic Signal Plans

ELLIOT ROAD AND SUMMIT PL
CITY OF CHANDLER PROJECT: # ENR 00-0050
SCOPE OF WORK: Traffic Signal Plans

KNOX ROAD AND McQUEEN ROAD
CITY OF CHANDLER PROJECT: # ENR 00-0050
SCOPE OF WORK: Traffic Signal Plans

ORCHID LANE AND COOPER ROAD
CITY OF CHANDLER PROJECT: # ENR 00-0050
SCOPE OF WORK: Traffic Signal Plans

DOBSON ROAD AND INTEL ENTRANCE
CITY OF CHANDLER PROJECT: # ENR 00-0050
SCOPE OF WORK: Traffic Signal Plans

DOBSON ROAD AND OCOTILLO ROAD
CITY OF CHANDLER PROJECT: # ENR 00-0050
SCOPE OF WORK: Traffic Signal Plans

RAY ROAD AND PONDEROSA AVENUE AND COLLEGE AVENUE
CITY OF CHANDLER PROJECT: # ENR 01-0001
SCOPE OF WORK: Traffic Signal Plans

DOBSON ROAD AND IRONWOOD DRIVE
CITY OF CHANDLER PROJECT: # ENR 01-0001
SCOPE OF WORK: Traffic Signal Plans

CHANDLER BOULEVARD AND CARRIAGE LANE
CITY OF CHANDLER PROJECT: # ENR 01-0001
SCOPE OF WORK: Traffic Signal Plans

RAY ROAD AND JACKSON STREET
CITY OF CHANDLER PROJECT: # ENR 01-0001
SCOPE OF WORK: Traffic Signal Plans

McQUEEN ROAD AND ORCHID LANE
CITY OF CHANDLER PROJECT: # ENR 01-0001
SCOPE OF WORK: Traffic Signal Plans

SR 260 CLIFFS PARKWAY
ADOT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

CHANDLER BOULEVARD AND COMMERCE DRIVE (LOS FELIZ DRIVE)
CITY OF CHANDLER PROJECT: # ENR 00-0109
SCOPE OF WORK: Traffic Signal Plans

SR 69 AND FAIN ROAD
YAVAPAI COUNTY, PUBLIC WORKS:
SCOPE OF WORK: Traffic Signal Plans

FOREST DRIVE AND SAN FRANCISCO STREET
CITY OF FLAGSTAFF: 04-97263
SCOPE OF WORK: Traffic Signal Plans

GLASSFORD HILL ROAD AND CENTRE COURT
TOWN OF PRESCOTT VALLEY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

GLASSFORD HILL ROAD AND FLORENTINE ROAD
TOWN OF PRESCOTT VALLEY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Modification Plans

GLASSFORD HILL ROAD AND LONG LOOK ROAD
TOWN OF PRESCOTT VALLEY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Modification Plans

LITCHFIELD ROAD AT YUMA ROAD AND WESTERN AVENUE
CITY OF GOODYEAR PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

LITCHFIELD ROAD AND GOODYEAR AIRPORT ENTRANCE
CITY OF GOODYEAR PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

SR 89A AND MINGUS AVENUE
ADOT PROJECT: # S-A89-A-501
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

LAKE VALLEY ROAD AND PAV WAY
TOWN OF PRESCOTT VALLEY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

MONTEZUMA STREETAND MERRITT AVENUE
CITY OF PRESCOTT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

US 180 AND SCHULTZ PASS ROAD
ADOT PROJECT: # 180 CN 218
SCOPE OF WORK: Traffic Signal Plans

SR 89 AND SR-40B AT MALL ENTRANCE
ADOT PROJECT: # 089-C(1)P
SCOPE OF WORK: Traffic Signal Modification Plans

SR 89 AND SR-40B AT RAILHEAD AVENUE
ADOT PROJECT: # 089-C(1)P
SCOPE OF WORK: Traffic Signal Modification Plans

US 60 AND ALMS SCHOOL ROAD TRAFFIC INTERCHANGE
ADOT PROJECT: # 060-C(8)P
SCOPE OF WORK: Traffic Signal Plans

US 60 AND DOBSON ROAD TRAFFIC INTERCHANGE
ADOT PROJECT: # 060-C(7)P
SCOPE OF WORK: Traffic Signal Plans

US 60 AND McCLINTOCK DRIVE TRAFFIC INTERCHANGE
ADOT PROJECT: # 060-C(6)P
SCOPE OF WORK: Traffic Signal Plans

US 60 AND MEAS DRIVE TRAFFIC INTERCHANGE
ADOT PROJECT: # 060-C(9)P
SCOPE OF WORK: Traffic Signal Plans

US 60 AND RURAL ROAD TRAFFIC INTERCHANGE
ADOT PROJECT: # 060-C(5)P
SCOPE OF WORK: Traffic Signal Plans

US 95 AND AVENUE 7E
ADOT PROJECT: # 095-B-500
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

WILLOW CREEK ROAD AND BLACK DRIVE
CITY OF PRESCOTT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

WILLOW CREEK ROAD AND GREEN AND PULLIUM
CITY OF PRESCOTT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

INDIAN SCHOOL ROAD – 64TH STREET TO 101L
CITY OF SCOTTSDALE PROJECT: # 1999-030-COS
SCOPE OF WORK: Traffic Management System Expansion Plans

83rd AVENUE AND UTOPIA ROAD
CITY OF PEORIA PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

^ Top

2001

CHANDLER BOULEVARD AND DESERT BREEZE BOULEVARD
CITY OF CHANDLER PROJECT: # ENR 01-0140
SCOPE OF WORK: Traffic Signal Plans

DOBSON ROAD AND CARLA VISTA DRIVE
CITY OF CHANDLER PROJECT: # ENR 01-0140
SCOPE OF WORK: Traffic Signal Plans

PECOS ROAD AND McQUEEN ROAD
CITY OF CHANDLER PROJECT: # ENR 01-0140
SCOPE OF WORK: Traffic Signal Plans

ALMA SCHOOL ROAD AND WEST LAKE DRIVE
CITY OF CHANDLER PROJECT: # ENR 01-0140
SCOPE OF WORK: Traffic Signal Plans

ARIZONA AVENUE AND PALOMINO DRIVE
CITY OF CHANDLER PROJECT: # ENR 01-0140
SCOPE OF WORK: Traffic Signal Plans

ARIZONA AVENUE AND WEST CHILTON DRIVE
CITY OF CHANDLER PROJECT: # ENR 01-0140
SCOPE OF WORK: Traffic Signal Plans

SR 69 – TOWN OF PRESCOTT VALLEY
ADOT PROJECT: # S-069-A-506
SCOPE OF WORK: Traffic Signal Interconnect Plans

FMS I-10 AND I-19
ADOT PROJECT: # 0-4 (151)
SCOPE OF WORK: Freeway Management System Plans

I-10 AND LITCHFIELD ROAD
ADOT PROJECT: # 010-B(004)A
SCOPE OF WORK: Traffic Signal Plans

I-10 AND LITCHFIELD ROAD TRAFFIC INTERCHANGE
ADOT PROJECT: # 010-B(004)A
SCOPE OF WORK: Traffic Signal Plans

30th STREET AND EUCLID AVENUE
CITY OF NATIONAL CITY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Interconnect Plans

FMS 56th STREET AND McCLINTOCK DRIVE (202L)
ADOT PROJECT: #202-C-507
SCOPE OF WORK: Traffic Signal, FMS Infrastructure Plans

SCOTTSDALE ROAD AND DRINKWATER BOULEVARD
CITY OF SCOTTSDALE PROJECT: # S2109
SCOPE OF WORK: Traffic Signal Plans

SIDEWINDER ROAD AND WILLIAMSON VALLEY ROAD
CITY OF PRESCOTT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

ARIZONA AVENUE (SR 87) AND CHANDLER BOULEVARD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF CHANDLER
SCOPE OF WORK: Intelligent Transportation System Plans

ARIZONA AVENUE (SR 87) AND ELLIOT ROAD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF CHANDLER
SCOPE OF WORK: Intelligent Transportation System Plans

ARIZONA AVENUE (SR 87) AND WARNER ROAD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF CHANDLER
SCOPE OF WORK: Intelligent Transportation System Plans

CHANDLER BOULEVARD AND KYRENE ROAD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF CHANDLER
SCOPE OF WORK: Intelligent Transportation System Plans

CHANDLER BOULEVARD AND 54TH STREET
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF CHANDLER
SCOPE OF WORK: Intelligent Transportation System Plans

CHANDLER BOULEVARD AND PRICE ROAD TRAFFIC INTERCHANGE
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF CHANDLER
SCOPE OF WORK: Intelligent Transportation System Plans

BASELINE ROAD AND GILBERT ROAD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF GILBERT
SCOPE OF WORK: Intelligent Transportation System Plans

CHANDLER BOULEVARD AND GILBERT ROAD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF GILBERT
SCOPE OF WORK: Intelligent Transportation System Plans

ELLIOT ROAD AND GILBERT ROAD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF GILBERT
SCOPE OF WORK: Intelligent Transportation System Plans

CIVIC CENTER DRIVE AND GILBERT ROAD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF GILBERT
SCOPE OF WORK: Intelligent Transportation System Plans

GALVESTON STREET AND GILBERT ROAD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF GILBERT
SCOPE OF WORK: Intelligent Transportation System Plans

HOUSTON AVENUE AND GILBERT ROAD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF GILBERT
SCOPE OF WORK: Intelligent Transportation System Plans

JUNIPER AVENUE AND GILBERT ROAD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF GILBERT
SCOPE OF WORK: Intelligent Transportation System Plans

59TH AVENUE AND NORTHERN AVENUE
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF GLENDALE
SCOPE OF WORK: Intelligent Transportation System Plans

59TH AVENUE AND CACTUS ROAD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF GLENDALE
SCOPE OF WORK: Intelligent Transportation System Plans

59TH AVENUE AND GREENWAY ROAD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF GLENDALE
SCOPE OF WORK: Intelligent Transportation System Plans

59TH AVENUE AND UNION HILLS AVENUE
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF GLENDALE
SCOPE OF WORK: Intelligent Transportation System Plans

59TH AVENUE AND BEHREND DRIVE
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF GLENDALE
SCOPE OF WORK: Intelligent Transportation System Plans

59TH AVENUE AND BELL ROAD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF GLENDALE
SCOPE OF WORK: Intelligent Transportation System Plans

THUNDERBIRD ROAD AND 67TH AVENUE
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF GLENDALE
SCOPE OF WORK: Intelligent Transportation System Plans

59TH AVENUE SOUTH OF MYRTLE AVENUE
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF GLENDALE
SCOPE OF WORK: Intelligent Transportation System Plans

1ST STREET AND COUNTRY CLUB DRIVE
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF MESA
SCOPE OF WORK: Intelligent Transportation System Plans

BROADWAY ROAD AND 1800 WEST
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF MESA
SCOPE OF WORK: Intelligent Transportation System Plans

BASELINE ROAD AND COUNTRY CLUB DRIVE
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF MESA
SCOPE OF WORK: Intelligent Transportation System Plans

BASELINE ROAD AND GILBERT ROAD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF MESA
SCOPE OF WORK: Intelligent Transportation System Plans

COUNTRY CLUB DRIVE AND 13TH PLACE
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF MESA
SCOPE OF WORK: Intelligent Transportation System Plans

MAIN STREET AND GILBERT ROAD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF MESA
SCOPE OF WORK: Intelligent Transportation System Plans

MCKELLIPS ROAD AND COUNTRY CLUB DRIVE
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF MESA
SCOPE OF WORK: Intelligent Transportation System Plans

McKELLIPS ROAD AND GILBERT ROAD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF MESA
SCOPE OF WORK: Intelligent Transportation System Plans

SOUTHERN AVENUE AND COUNTRY CLUB DRIVE
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF MESA
SCOPE OF WORK: Intelligent Transportation System Plans

SOUTHERN AVENUE AND GILBERT ROAD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF MESA
SCOPE OF WORK: Intelligent Transportation System Plans

UNIVERSITY DRIVE AND ALMA SCHOOL ROAD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF MESA
SCOPE OF WORK: Intelligent Transportation System Plans

UNIVERSITY DRIVE AND GREENFIELD ROAD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF MESA
SCOPE OF WORK: Intelligent Transportation System Plans

UNIVERSITY DRIVE AND NORTH LAZONA
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF MESA
SCOPE OF WORK: Intelligent Transportation System Plans

THUNDERBIRD ROAD AND 83RD AVENUE
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF PEORIA
SCOPE OF WORK: Intelligent Transportation System Plans

THUNDERBIRD ROAD AND 84TH DRIVE
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF PEORIA
SCOPE OF WORK: Intelligent Transportation System Plans

THUNDERBIRD ROAD WEST OF LOOP 101
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF PEORIA
SCOPE OF WORK: Intelligent Transportation System Plans

BROADWAY ROAD AND 32ND STREET
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF PHOENIX
SCOPE OF WORK: Intelligent Transportation System Plans

BROADWAY ROAD AND 40TH STREET
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF PHOENIX
SCOPE OF WORK: Intelligent Transportation System Plans

CACTUS ROAD AND TATUM BOULEVARD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF PHOENIX
SCOPE OF WORK: Intelligent Transportation System Plans

CACTUS ROAD AT THUNDERBIRD ROAD AND CAVE CREEK ROAD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF PHOENIX
SCOPE OF WORK: Intelligent Transportation System Plans

CACTUS ROAD AND 32ND STREET
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF PHOENIX
SCOPE OF WORK: Intelligent Transportation System Plans

CACTUS ROAD AND 36TH STREET
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF PHOENIX
SCOPE OF WORK: Intelligent Transportation System Plans

CHANDLER BOULEVARD AND 48TH STREET
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF PHOENIX
SCOPE OF WORK: Intelligent Transportation System Plans

CHANDLER BOULEVARD AND 50TH STREET
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF PHOENIX
SCOPE OF WORK: Intelligent Transportation System Plans

INDIAN SCHOOL ROAD AND 7TH AVENUE
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF PHOENIX
SCOPE OF WORK: Intelligent Transportation System Plans

INDIAN SCHOOL ROAD AND 7TH STREET
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF PHOENIX
SCOPE OF WORK: Intelligent Transportation System Plans

INDIAN SCHOOL ROAD AND 16TH STREET
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF PHOENIX
SCOPE OF WORK: Intelligent Transportation System Plans

INDIAN SCHOOL ROAD AND 19TH AVENUE
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF PHOENIX
SCOPE OF WORK: Intelligent Transportation System Plans

INDIAN SCHOOL ROAD AND 19TH STREET
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF PHOENIX
SCOPE OF WORK: Intelligent Transportation System Plans

INDIAN SCHOOL ROAD AND 23RD AVENUE
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF PHOENIX
SCOPE OF WORK: Intelligent Transportation System Plans

INDIAN SCHOOL ROAD AND 27RD AVENUE
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF PHOENIX
SCOPE OF WORK: Intelligent Transportation System Plans

INDIAN SCHOOL ROAD AND 32ND STREET
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF PHOENIX
SCOPE OF WORK: Intelligent Transportation System Plans

INDIAN SCHOOL ROAD AND 44ND STREET
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF PHOENIX
SCOPE OF WORK: Intelligent Transportation System Plans

INDIAN SCHOOL ROAD AND 51ST AVENUE
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF PHOENIX
SCOPE OF WORK: Intelligent Transportation System Plans

INDIAN SCHOOL ROAD AND 59TH AVENUE
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF PHOENIX
SCOPE OF WORK: Intelligent Transportation System Plans

INDIAN SCHOOL ROAD AND 67TH AVENUE
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF PHOENIX
SCOPE OF WORK: Intelligent Transportation System Plans

INDIAN SCHOOL ROAD AND 75TH AVENUE
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF PHOENIX
SCOPE OF WORK: Intelligent Transportation System Plans

INDIAN SCHOOL ROAD AND 83RD AVENUE
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF PHOENIX
SCOPE OF WORK: Intelligent Transportation System Plans

INDIAN SCHOOL ROAD AND 91ST AVENUE
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF PHOENIX
SCOPE OF WORK: Intelligent Transportation System Plans

INDIAN SCHOOL ROAD AND SR 51
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF PHOENIX
SCOPE OF WORK: Intelligent Transportation System Plans

THUNDERBIRD ROAD AND 7TH STREET
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF PHOENIX
SCOPE OF WORK: Intelligent Transportation System Plans

THUNDERBIRD ROAD AND 26TH AVENUE
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF PHOENIX
SCOPE OF WORK: Intelligent Transportation System Plans

THUNDERBIRD ROAD AND 30TH AVENUE
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF PHOENIX
SCOPE OF WORK: Intelligent Transportation System Plans

THOMAS ROAD AND 59TH AVENUE
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF PHOENIX
SCOPE OF WORK: Intelligent Transportation System Plans

UNIVERSITY DRIVE AND 40TH STREET
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF PHOENIX
SCOPE OF WORK: Intelligent Transportation System Plans

SHEA BOULEVARD AND LOOP 101
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF SCOTTSDALE
SCOPE OF WORK: Intelligent Transportation System Plans

SHEA BOULEVARD AND HAYDEN ROAD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF SCOTTSDALE
SCOPE OF WORK: Intelligent Transportation System Plans

McDOWELL ROAD AND HAYDEN ROAD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF SCOTTSDALE
SCOPE OF WORK: Intelligent Transportation System Plans

CACTUS ROAD AND HAYDEN ROAD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF SCOTTSDALE
SCOPE OF WORK: Intelligent Transportation System Plans

REDFIELD ROAD AND HAYDEN ROAD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF SCOTTSDALE
SCOPE OF WORK: Intelligent Transportation System Plans

CACTUS ROAD AND 90TH STREET
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF SCOTTSDALE
SCOPE OF WORK: Intelligent Transportation System Plans

84TH STREET AND CACTUS ROAD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF SCOTTSDALE
SCOPE OF WORK: Intelligent Transportation System Plans

CACTUS ROAD AND 64TH STREET
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF SCOTTSDALE
SCOPE OF WORK: Intelligent Transportation System Plans

SHEA BOULEVARD AND 96TH STREET
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF SCOTTSDALE
SCOPE OF WORK: Intelligent Transportation System Plans

CAMELBACK ROAD AND HAYDEN ROAD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF SCOTTSDALE
SCOPE OF WORK: Intelligent Transportation System Plans

INDIAN BEND ROAD AND HAYDEN ROAD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF SCOTTSDALE
SCOPE OF WORK: Intelligent Transportation System Plans

ROYAL PALM ROAD AND HAYDEN ROAD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF SCOTTSDALE
SCOPE OF WORK: Intelligent Transportation System Plans

SHEA BOULEVARD AND 102ND STREET
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF SCOTTSDALE
SCOPE OF WORK: Intelligent Transportation System Plans

EAST BASELINE ROAD AND SOUTH McCLINTOCK
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF TEMPE
SCOPE OF WORK: Intelligent Transportation System Plans

BROADWAY ROAD AND TERRACE ROAD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF TEMPE
SCOPE OF WORK: Intelligent Transportation System Plans

BROADWAY ROAD AND 52ND STREET
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF TEMPE
SCOPE OF WORK: Intelligent Transportation System Plans

EAST BROADWAY ROAD AND RIVER DRIVE
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF TEMPE
SCOPE OF WORK: Intelligent Transportation System Plans

MCCLINTOCK DRIVE AND CURRY ROAD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF TEMPE
SCOPE OF WORK: Intelligent Transportation System Plans

MCCLINTOCK DRIVE AND RIO SALADO PARKWAY
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF TEMPE
SCOPE OF WORK: Intelligent Transportation System Plans

SOUTHERN AVENUE AND MCCLINTOCK DRIVE
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF TEMPE
SCOPE OF WORK: Intelligent Transportation System Plans

EAST WARNER ROAD AND SOUTH McCLINTOCK DRIVE
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF TEMPE
SCOPE OF WORK: Intelligent Transportation System Plans

UNIVERSITY DRIVE AND 52ND STREET
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF TEMPE
SCOPE OF WORK: Intelligent Transportation System Plans

UNIVERSITY DRIVE AND EVERGREEN ROAD
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF TEMPE
SCOPE OF WORK: Intelligent Transportation System Plans

UNIVERSITY DRIVE AND McALLISTER
MARICOPA COUNTY PROJECT: # AZTECH SMART CORRIDORS, CITY OF TEMPE
SCOPE OF WORK: Intelligent Transportation System Plans

SR 77 AT JCT MIRACLE MILE AND PUSCH VIEW LANE
ADOT PROJECT: # 077-A-(3)
SCOPE OF WORK: Loop Detector Replacement, Pavement Markings and Signing Plans

SR 260 – PORTER MOUNTAIN ROAD
ADOT PROJECT: # S 260-C-504
SCOPE OF WORK: Traffic Signal, Pavement Marking and Signing Plans

ESTRELLA PARKWAY AND VAN BUREN
ADOT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

ESTRELLA PARKWAY AND VAN BUREN
CITY OF GOODYEAR PROJECT: # 00-XXX-000
SCOPE OF WORK: Temporary Span Wire Traffic Signal Plans

B-8, 4TH AVENUE AND 10TH STREET
ADOT PROJECT: # S-B08-A-501
SCOPE OF WORK: Traffic Signal Modification Plans

B-8 AT 4TH AVENUE AND 12TH STREET
ADOT PROJECT: # S-B08-A-501
SCOPE OF WORK: Traffic Signal Removal Plans

B-8, 4TH AVENUE AND 14TH STREET
ADOT PROJECT: # S-B08-A-501
SCOPE OF WORK: Traffic Signal Modification Plans

B-8, 4TH AVENUE AND ORANGE AVENUE
ADOT PROJECT: # S-B08-A-501
SCOPE OF WORK: Pavement Markings and Traffic Signal Modification Plans

^ Top

2002

4TH STREET AND SOLIERE AVENUE
CITY OF FLAGSTAFF PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

56TH STREET – MCCLINTOCK DRIVE (202L)
ADOT PROJECT: # 202-C-507
SCOPE OF WORK: FMS Infrastructure Plans (change order)

ARIZONA AVENUE AND FRYE ROAD TO CHANDLER BOULEVARD
CITY OF CHANDLER PROJECT: # 00-XXX-000
SCOPE OF WORK: Fiber Duct Conduit Plans

I-10 SUNLAND GIN ROAD TRAFFIC INTERCHANGE
ADOT PROJECT: # IM-10D(2)A
SCOPE OF WORK: Traffic Signal Plans

LITCHFIELD ROAD AND VAN BUREN STREET
CITY OF GOODYEAR PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Modification Plans

LITCHFIELD ROAD AND MC 85 AT GOODYEAR AIRPORT
CITY OF GOODYEAR PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal, Loop Detector Replacement, Pedestrian Signals and Pavement Marking Plans

I-40 NEEDLE MOUNTAIN – SR 95
ADOT PROJECT: # 040-A(010)A
SCOPE OF WORK: Weigh in Motion Replacement Plans

SR 89 – RAILHEAD
ADOT PROJECT: # 089-C(1)P
SCOPE OF WORK: Traffic Signal Modification Plans

RAY ROAD DESERT BREEZE AND LAKESHORE DRIVE
CITY OF CHANDLER PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

SR 77 MP 375.5
ADOT PROJECT: # F-027-1-534
SCOPE OF WORK: Road Weather Information System (RWIS) Plans

SR 69 AND LAKE VALLEY ROAD
ADOT PROJECT: # F-027-1-534
SCOPE OF WORK: Traffic Signal Modification Plans

US 191 AND OLD COUNTRY CLUB ROAD AT US 70
ADOT PROJECT: # 191-B(002)A
SCOPE OF WORK: Loop Detector Replacement Plans

SR 260 WESTBOUND, MP 302.4
ADOT PROJECT: # N900-0-585
SCOPE OF WORK: Variable Message Sign Plans

^ Top

2003

TMS EXPANSION L-101 VIA LINDA TO SCOTTSDALE ROAD
CITY OF SCOTTSDALE PROJECT: # CM-SCT-0-(013)A
SCOPE OF WORK: Traffic management System Plans

FROM SR101 FMS TO CORPORATE YARD
CITY OF SCOTTSDALE PROJECT: # 2000-164-COS
SCOPE OF WORK: Intelligent Transportation System Plans

SHEA BOULEVARD FROM SCOTTSDALE ROAD TO SR101
CITY OF SCOTTSDALE PROJECT: # 2000-164-COS
SCOPE OF WORK: Intelligent Transportation System Plans

CACTUS ROAD FROM L101 TO FRANK LLOYD WRIGHT ROAD
CITY OF SCOTTSDALE PROJECT: # 2000-164-COS
SCOPE OF WORK: Intelligent Transportation System Plans

SCOTTSDALE ROAD FROM INDIAN SCHOOL TO FRANK LLOYD WRIGHT
CITY OF SCOTTSDALE PROJECT: # 2000-164-COS
SCOPE OF WORK: Intelligent Transportation System Plans

INTERSECTION OF SHEA BOULEVARD AND 96TH STREET
CITY OF SCOTTSDALE PROJECT: # 2000-164-COS
SCOPE OF WORK: Intelligent Transportation System Plans

HAYDEN ROAD FROM SHEA BOULEVARD TO REDFIELD ROAD
CITY OF SCOTTSDALE PROJECT: # 2000-164-COS
SCOPE OF WORK: Intelligent Transportation System Plans

SR 89A AND ZALESKY ROAD
ADOT PROJECT: # A89-B-500
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

SB 40 AND FLORIDA STREET
ADOT PROJECT: # 952-3-502
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

ESTRELLA PARKWAY AND VAN BUREN
CITY OF GOODYEAR PROJECT: # 00-XXX-000
SCOPE OF WORK: Temp Traffic Signal and Traffic Signal Plans

ESTRELLA PARKWAY AND YUMA ROAD
CITY OF GOODYEAR PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

ESTRELLA PARKWAY AND McDOWELL ROAD
CITY OF GOODYEAR PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

ESTRELLA PARKWAY INTERCONNECT
CITY OF GOODYEAR PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Interconnect Plans

SR 69 AND FAIN ROAD AT PRESCOTT COUNTY CLUB
YAVAPAI COUNTY PUBLIC WORKS PROJECT: # 00-XXX-00
SCOPE OF WORK: Traffic Signal Plans

GLASSFORD HILL ROAD AND SPOUSE DRIVE
TOWN OF PRESCOTT VALLEY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

US 60 – GRAND AVENUE AND MARYLAND AVENUE AND 55TH AVENUE
ADOT PROJECT: # 060-B(008)
SCOPE OF WORK: Traffic Signal Plans

US 60 – GRAND AVENUE AND MARYLAND AVENUE AND 54TH AVENUE
ADOT PROJECT: # 060-B(008)
SCOPE OF WORK: Traffic Signal Plans

SR 87 AND SR 287
CITY OF COOLIDGE PROJECT: 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

I-8 ARABY ROAD AND GILA RIDGE ROAD TRAFFIC INTERCHANGE
ADOT PROJECT: # I-008-A-504
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

I-10 AND LITCHFIELD ROAD TRAFFIC INTERCHANGE
ADOT PROJECT: # 010-B(004)A
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

IRON SPRINGS ROAD AND PONDEROSA DRIVE
CITY OF PRESCOTT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

LITCHFIELD ROAD AND THOMAS ROAD
CITY OF GOODYEAR PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Modification Plans

LITCHFIELD ROAD AND THOMAS ROAD
CITY OF GOODYEAR PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Modification Plans

56TH STREET – MCCLINTOCK DRIVE (202L)
ADOT PROJECT: # 202-C-507
SCOPE OF WORK: Traffic Signal Plans

NAVAJO DRIVE AND YAVAPAI ROAD
TOWN OF PRESCOTT VALLEY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

NAVAJO DRIVE AND FLORENTINE ROAD
TOWN OF PRESCOTT VALLEY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

SR 69 AND NAVAJO DRIVE
ADOT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

SR 287 AND SR 87 AT VAH KI INN ROAD
ADOT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

JCT US 70 AND SAN CARLOS
ADOT PROJECT: # 170-A-500
SCOPE OF WORK: Pavement Marking and Signing Plans

SR 77 AND MP 357 (PAPER MILL ROAD)
ADOT PROJECT: # 077-B-504
SCOPE OF WORK: Traffic Signal and Signing Plans

SR 77 AND RIVER ROAD TO INA ROAD
ADOT PROJECT: # 077-A(008)A
SCOPE OF WORK: Pavement Marking, Signing

US 60 AND McCLINTOCK DRIVE TRAFFIC INTERCHANGE
ADOT PROJECT: # 060-C(6)P
SCOPE OF WORK: Traffic Signal Plans (Change Order)

US 60 AND McNEIL STREET
ADOT PROJECT: # U-060-E-503
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

WILLOW CREEK ROAD AND HERITAGE PARK ROAD
CITY OF PRESCOTT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

WILLOW CREEK DRIVE AND PONDEROSA DRIVE
CITY OF PRESCOTT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

WILLOW CREEK ROAD AND SMOKE TREE LANE AT NICHOLET TRAIL
CITY OF PRESCOTT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

^ Top

2004

ADOT SIGNAL TRAINING MATERIAL
ADOT PROJECT:
SCOPE OF WORK: CAD Exhibits for the ADOT Traffic Signal Design Training Manual

ALMA SCHOOL AND WILLIS
CITY OF CHANDLER PROJECT: # ST 0418-201
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

BUTLER AVENUE AND BABBITT DRIVE
CITY OF FLAGSTAFF PROJECT: # 03-03002
SCOPE OF WORK: Traffic Signal Plans

I-10 AND ESTRELLA PARKWAY
ADOT PROJECT: # 00-XXX-000
SCOPE OF WORK: Temporary Traffic Signal, Pavement Marking and Signing Plans

BULLARD ROAD AND McDOWELL ROAD
CITY OF GOODYEAR PROJECT: # 00-XXX-000
SCOPE OF WORK: Span Wire Traffic Signal Plans

LRT, LINE SECTION 4 – WASHINGTON STREET AND 56TH STREET
VALLEY METRO RAIL PROJECT: # LRT-04-018-LS4
SCOPE OF WORK: Traffic Signal Plans

LRT, LINE SECTION 4 – WASHINGTON STREET AND PRIEST DRIVE
VALLEY METRO RAIL PROJECT: # LRT-04-018-LS4
SCOPE OF WORK: Traffic Signal Plans

LRT, LINE SECTION 4 – WASHINGTON STREET AND CENTER PARKWAY
VALLEY METRO RAIL PROJECT: # LRT-04-018-LS4
SCOPE OF WORK: Traffic Signal Plans

LRT, LINE SECTION 4 – WASHINGTON STREET AND TRILLIUM
VALLEY METRO RAIL PROJECT: # LRT-04-018-LS4
SCOPE OF WORK: Traffic Signal Plans

LRT, LINE SECTION 4 – WASHINGTON STREET AND WELLS FARGO
VALLEY METRO RAIL PROJECT: # LRT-04-018-LS4
SCOPE OF WORK: Traffic Signal Plans

LRT, LINE SECTION 5 – ASH AVENUE AND THIRD STREET
VALLEY METRO RAIL PROJECT: # LRT-04-022-LS5
SCOPE OF WORK: Traffic Signal Plans

LRT, LINE SECTION 5 – MILL AVENUE AND THIRD STREET
VALLEY METRO RAIL PROJECT: # LRT-04-022-LS5
SCOPE OF WORK: Traffic Signal Plans

LRT, LINE SECTION 5 – VETERANS WAY AND COLLEGE AVENUE
VALLEY METRO RAIL PROJECT: # LRT-04-022-LS5
SCOPE OF WORK: Traffic Signal Plans

LRT, LINE SECTION 5 – VETERANS WAY AND SIXTH STREET
VALLEY METRO RAIL PROJECT: # LRT-04-022-LS5
SCOPE OF WORK: Traffic Signal Plans

LRT, LINE SECTION 5 – UNIVERSITY DRIVE AND VETERANS WAY
VALLEY METRO RAIL PROJECT: # LRT-04-022-LS5
SCOPE OF WORK: Traffic Signal Plans

LRT, LINE SECTION 5 – RURAL ROAD AND TERRACE ROAD (REALIGNED)
VALLEY METRO RAIL PROJECT: # LRT-04-022-LS5
SCOPE OF WORK: Traffic Signal Plans

LRT, LINE SECTION 5 – TERRACE ROAD AND LEMON STREET
VALLEY METRO RAIL PROJECT: # LRT-04-022-LS5
SCOPE OF WORK: Traffic Signal Plans

LRT, LINE SECTION 5 – APACHE BOULEVARD AND TERRACE ROAD
VALLEY METRO RAIL PROJECT: # LRT-04-022-LS5
SCOPE OF WORK: Traffic Signal Plans

LRT, LINE SECTION 5 – APACHE BOULEVARD AND DORSEY LANE
VALLEY METRO RAIL PROJECT: # LRT-04-022-LS5
SCOPE OF WORK: Traffic Signal Plans

LRT, LINE SECTION 5 – APACHE BOULEVARD AND UNA-BUTTE AVENUE
VALLEY METRO RAIL PROJECT: # LRT-04-022-LS5
SCOPE OF WORK: Traffic Signal Plans

LRT, LINE SECTION 5 – APACHE BOULEVARD AND McCLINTOCK DRIVE
VALLEY METRO RAIL PROJECT: # LRT-04-022-LS5
SCOPE OF WORK: Traffic Signal Plans

LRT, LINE SECTION 5 – APACHE BOULEVARD AND MARTIN LANE
VALLEY METRO RAIL PROJECT: # LRT-04-022-LS5
SCOPE OF WORK: Traffic Signal Plans

LRT, LINE SECTION 5 – APACHE BOULEVARD AND RIVER DRIVE
VALLEY METRO RAIL PROJECT: # LRT-04-022-LS5
SCOPE OF WORK: Traffic Signal Plans

LRT, LINE SECTION 5 – APACHE BOULEVARD AND LOOP 101 SB FR
VALLEY METRO RAIL PROJECT: # LRT-04-022-LS5
SCOPE OF WORK: Traffic Signal Plans

LRT, LINE SECTION 5 – APACHE BOULEVARD AND LOOP 101 NB FR
VALLEY METRO RAIL PROJECT: # LRT-04-022-LS5
SCOPE OF WORK: Traffic Signal Plans

LRT, LINE SECTION 5 – APACHE BOULEVARD AND LEBANON LANE
VALLEY METRO RAIL PROJECT: # LRT-04-022-LS5
SCOPE OF WORK: Traffic Signal Plans

LRT, LINE SECTION 5 – MAIN STREET AND ROOSEVELT ROAD
VALLEY METRO RAIL PROJECT: # LRT-04-022-LS5
SCOPE OF WORK: Traffic Signal Plans

LRT, LINE SECTION 5 – MAIN STREET AND DOBSON ROAD
VALLEY METRO RAIL PROJECT: # LRT-04-022-LS5
SCOPE OF WORK: Traffic Signal Plans

LRT, LINE SECTION 5 – MAIN STREET AND SYCAMORE STREET
VALLEY METRO RAIL PROJECT: # LRT-04-022-LS5
SCOPE OF WORK: Traffic Signal Plans

LRT, LINE SECTION 5 – VETERANS WAY PEDESTRIAN CROSSING
VALLEY METRO RAIL PROJECT: # LRT-04-022-LS5
SCOPE OF WORK: Traffic Signal Plans

LRT, LINE SECTION 5 – APACHE BOULEVARD LOOP 101 PARK-AND-RIDE LOT ACCESS
VALLEY METRO RAIL PROJECT: # LRT-04-022-LS5
SCOPE OF WORK: Traffic Signal Plans

LRT, LINE SECTION 5 – APACHE BOULEVARD POLICE ACCESS
VALLEY METRO RAIL PROJECT: # LRT-04-022-LS5
SCOPE OF WORK: Traffic Signal Plans

LRT, LINE SECTION 5 – RURAL ROAD AND OLD TERRACE ROAD
VALLEY METRO RAIL PROJECT: # LRT-04-022-LS5
SCOPE OF WORK: Traffic Signal Plans

LRT, LINE SECTION 5 – FIRE STATION ACCESS ROAD
VALLEY METRO RAIL PROJECT: # LRT-04-022-LS5
SCOPE OF WORK: Traffic Signal Plans

LRT, LINE SECTION 5 – TEMPE CANAL CROSSWALK
VALLEY METRO RAIL PROJECT: # LRT-04-022-LS5
SCOPE OF WORK: Traffic Signal Plans

LRT, LINE SECTION 5 – MAIN STREET AND PARK-N-RIDE
VALLEY METRO RAIL PROJECT: # LRT-04-022-LS5
SCOPE OF WORK: Traffic Signal Plans

LRT, LINE SECTION 5 – APACHE BOULEVARD PARK-N-RIDE ACCESS
VALLEY METRO RAIL PROJECT: # LRT-04-022-LS5
SCOPE OF WORK: Traffic Signal Plans

PIMA ROAD AND HAPPY VALLEY ROAD
CITY OF SCOTTSDALE PROJECT: # V3704
SCOPE OF WORK: Traffic Signal Modification Plans

GURLEY STREET AND ARIZONA AVENUE
CITY OF PRESCOTT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

GURLEY STREET AND GRANITE STREET
CITY OF PRESCOTT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

GURLEY STREET AND McCORMICK STREET
CITY OF PRESCOTT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

MILLER VALLEY ROAD AND FAIR STREET AT HILLSIDE AVENUE
CITY OF PRESCOTT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

SHELDON STREET AND GROVE AVENUE
CITY OF PRESCOTT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

US 95 AND BINGHAM AVENUE
ADOT PROJECT: # 00-XXX-00
SCOPE OF WORK: Traffic Signal Plans

SR 73 AND YUCCA FLAT AT INDIAN HEALTH SERVICES
ADOT PROJECT: # 215-514
SCOPE OF WORK: , Traffic Control, Pavement Marking and Signing Plans

SR 77 AND SR 277
ADOT PROJECT: # STP 077-B(003)A
SCOPE OF WORK: Traffic Control and Pavement Marking Plans

US 60 AND VAL VISTA DRIVE TRAFFIC INTERCHANGE
ADOT PROJECT: # CM-060-C(010)
SCOPE OF WORK: Traffic Signal Plans

US 60 AND STAPLEY DRIVE TRAFFIC INTERCHANGE
ADOT PROJECT: # CM-060-C(010)
SCOPE OF WORK: Traffic Signal Plans

US 60 AND GILBERT ROAD TRAFFIC INTERCHANGE
ADOT PROJECT: # 060-C(014)
SCOPE OF WORK: Traffic Signal Plans

US 95 AND 20TH STREET
ADOT PROJECT: # TEA-YUM-0(003)A
SCOPE OF WORK: Traffic Signal Plans

US 163 AND N-106
ADOT PROJECT: # 163 NA 395
SCOPE OF WORK: Traffic Signal, Pavement Marking and Signing Plans

WILLOW CREEK ROAD AND BLACK DRIVE
CITY OF PRESCOTT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Modification Plans

WILLOW CREEK DRIVE AND GAIL GARDNER WAY
CITY OF PRESCOTT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

IRON SPRINGS ROAD AND GAIL GARDNER WAY
CITY OF PRESCOTT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

WILLOW CREEK ROAD AND BLACK DRIVE
CITY OF PRESCOTT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

^ Top

2005

101L AND GRANADA DRIVE
MARICOPA COUNTY PROJECT: # TER 037
SCOPE OF WORK: Integrated Emergency and Transportation Communication Network Plans

BELL ROAD, 51st AVENUE TO 83rd AVENUE
ADOT PROJECT: # GLN-0(021)A
SCOPE OF WORK: Intelligent Transportation System Plans

HANCOCK ROAD AND TRANE ROAD LEFT TURN CONVERSION
CITY OF BULLHEAD CITY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Modification Plans

CHANDLER BOULEVARD AND CALIFORNIA STREET
CITY OF CHANDLER PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

I-10 AND FORT GRANT ROAD TRAFFIC INTERCHANGE
ADOT PROJECT: # IM-TEA 010-F(002)B
SCOPE OF WORK: Traffic Signal Plans

SR 347 AND SR 238
ADOT PROJECT: PERMIT PROJECT
SCOPE OF WORK: Traffic Signal Plans

CACTUS ROAD AND 59TH AVENUE TO 52ND AVENUE
CITY OF GLENDALE PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Interconnect Plans

CACTUS ROAD AND 51ST AVENUE AT CHOLLA STREET
CITY OF GLENDALE PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Interconnect Plans

59TH AVENUE AND UTOPIA
CITY OF GLENDALE PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Interconnect Plans

57TH AVENUE AND UNION HILLS DRIVE
CITY OF GLENDALE PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Interconnect Plans

LITCHFIELD ROAD – MC 85 TO WIGWAM BOULEVARD
CITY OF GOODYEAR PROJECT: # CM-GDY-0(007)A
SCOPE OF WORK: Fiber Optic Interconnect Plans

GLASSFORD HILL ROAD AND GRANVILLE PARKWAY
TOWN OF PRESCOTT VALLEY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

I-10 AND LITCHFIELD ROAD TRAFFIC INTERCHANGE
CITY OF GLENDALE PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

I-40 AND NORTH PARK TRAFFIC INTERCHANGE
ADOT PROJECT: # 040-D(015)N
SCOPE OF WORK: Traffic Signal Plans

INDIAN SCHOOL AND PEBBLE CREEK PARKWAY
CITY OF GOODYEAR PROJECT: # H.T.E. 05-2115
SCOPE OF WORK: Traffic Signal Plans

IRON SPRINGS ROAD AND WILLIAMSON VALLEY ROAD
CITY OF PRESCOTT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

WILLIAMSON VALLEY ROAD AND SIDE WINDER ROAD
CITY OF PRESCOTT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

IRON SPRINGS ROAD AND MEADOWRIDGE
CITY OF PRESCOTT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

LITCHFIELD ROAD AND VAN BUREN STREET
CITY OF GOODYEAR PROJECT: # 00-XXX-000
SCOPE OF WORK: Striping Modification Plan

LITCHFIELD ROAD AND McDOWELL ROAD
CITY OF GOODYEAR PROJECT: # 00-XXX-000
SCOPE OF WORK: Striping Modification Plan

S. LONE TREE ROAD AND W. PINE KNOLL DRIVE
CITY OF FLAGSTAFF PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

LRT, LINE SECTION 5 – (ADDENDUM)
VALLEY METRO RAIL PROJECT: # LRT-04-022-LS5
SCOPE OF WORK: Traffic Signal Plans (Revisions)

MC 85 AND LITCHFIELD ROAD
CITY OF GOODYEAR PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Modification Plans

US 89A (MILTON ROAD) AND PLAZA AVENUE
ADOT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

OCOTILLO ROAD AND HAWES ROAD
TOWN OF QUEEN CREEK PROJECT: # 00-XXX-00
SCOPE OF WORK: Traffic Signal Plans

TRAFFIC CALMING STANDARD DRAWING
TOWN OF QUEEN CREEK PROJECT: # 00-XXX-00
SCOPE OF WORK: Standard Drawing – Speed Hump

OCOTILLO ROAD AND HAWES ROAD
TOWN OF QUEEN CREEK PROJECT: # 00-XXX-00
SCOPE OF WORK: Traffic Signal Plans

SR 264 EASTBOUND AND WESTBOUND AT MP 445.5 (VMS NO. 432 & 433)
ADOT PROJECT: # 999-A-505
SCOPE OF WORK: Variable Message Sign Plans

SR 264, WESTBOUND AT MP 475.8 (VMS NO. 343)
ADOT PROJECT: # 999-A-505
SCOPE OF WORK: Variable Message Sign Plans

I-40, EASTBOUND AT MP 310.1 (VMS NO. 431)
ADOT PROJECT: # 999-A-505
SCOPE OF WORK: Variable Message Sign Plans

I-40, EASTBOUND AT MP 250.7 (VMS NO. 353)
ADOT PROJECT: # 999-A-505
SCOPE OF WORK: Variable Message Sign Plans

I-15, NORTHBOUND AT MP 7.7 (VMS 370)
ADOT PROJECT: # 999-A-505
SCOPE OF WORK: VARIABLE MESSAGE SIGN PLANS

I-15, SOUTHBOUND AT MP 28.1 (VMS NO. 371)
ADOT PROJECT: # 999-A-505
SCOPE OF WORK: Variable Message Sign Plans

I-17, SOUTHBOUND AT MILE POST 228.2 (VMS 420)
ADOT PROJECT: # 999-A-505
SCOPE OF WORK: Variable Message Sign Plans

I-40, EASTBOUND AT MP 42.3 (VMS NO. 378)
ADOT PROJECT: # 999-A-508
SCOPE OF WORK: Variable Message Sign Plans

SR 90, SOUTHBOUND AT MP 296.7 (VMS NO. 393)
ADOT PROJECT: # 999-A-508
SCOPE OF WORK: Variable Message Sign Plans

SR 90, NORTHBOUND AT MP 309.9 (VMS NO. 392)
ADOT PROJECT: # 999-A-508
SCOPE OF WORK: Variable Message Sign Plans

US 191 AND IR-102
ADOT PROJECT: #191 AP 446
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

SR 73 AND WHITERIVER INDIAN HOSPITAL
ADOT PROJECT: # S 073-A-503
SCOPE OF WORK: Traffic Control Plans

INDIAN SCHOOL ROAD AND WIGWAM BOULEVARD
MARICOPA COUNTY PROJECT: # TT 203
SCOPE OF WORK: Traffic Signal Plans

^ Top

2006

B-40 AND SR 77
ADOT PROJECT: # I 040-D-506
SCOPE OF WORK: Traffic Signal and Guide Sign Plans

US 89 AND CAMPBELL AVENUE
ADOT PROJECT: # 00-XXX-000
SCOPE OF WORK: Pavement Marking Plans

I-40 McCARROLL TRAFFIC INTERCHANGE – QUERINO
ADOT PROJECT: # 040-E-(200)
SCOPE OF WORK: Weigh In Motion Replacement Plans

SR 260 AND RODEO DRIVE
ADOT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

US 89 AND TOWNSEND – WINONA
ADOT PROJECT: PERMIT PROJECT – COCONINO COUNTY
SCOPE OF WORK: Traffic Signal Plans

SR 260 AND WOOLFORD ROAD
ADOT PROJECT: # S-260-C-502
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

BASHA ROAD AND OCOTILLO ROAD
CITY OF CHANDLER PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

GERMANN ROAD IMPROVEMENTS
CITY OF CHANDLER PROJECT: # ST 0504-201
SCOPE OF WORK: Traffic Signal Improvement Plans

PECOS ROAD AND EMMETT DRIVE
CITY OF CHANDLER PROJECT: # ST 0504-201
SCOPE OF WORK: Traffic Signal and Pavement Marking Plans

BUTLER AVENUE AND FOURTH STREET
CITY OF FLAGSTAFF PROJECT: # 040-92-32-607
SCOPE OF WORK: Span Wire Traffic Signal Plans

US 180 AND FOREST AVENUE
ADOT PROJECT: # NON-FA
SCOPE OF WORK: Pavement Marking and Signing Plans

91ST AVENUE
CITY OF GLENDALE PROJECT: # 00-XXX-000
SCOPE OF WORK: As-built Plans

CAMELBACK ROAD AND 87TH AVENUE
CITY OF GLENDALE PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

93RD AVENUE, SOUTHBOUND
CITY OF GLENDALE PROJECT: # 00-XXX-000
SCOPE OF WORK: Dynamic Message Sign Foundation Plan

LITCHFIELD ROAD AT I-10 TO VAN BUREN STREET
CITY OF GOODYEAR PROJECT: # 00-XXX-000
SCOPE OF WORK: Pavement Marking and Signing Plans

INDIAN SCHOOL AND CLUBHOUSE DRIVE AT FALCON DRIVE
CITY OF GOODYEAR PROJECT: # H.T.E. # 04-6257
SCOPE OF WORK: Traffic Signal Plans

McDOWELL ROAD AND 136TH DRIVE
CITY OF GOODYEAR PROJECT: # HTE # 06-0147
SCOPE OF WORK: Traffic Signal Plans

YUMA ROAD AND WILDFLOWER DRIVE
CITY OF GOODYEAR PROJECT: # HTE # 06-2940
SCOPE OF WORK: Traffic Signal Plans

YUMA ROAD AND GOODYEAR BOULEVARD
CITY OF GOODYEAR PROJECT: # HTE # 06-6004
SCOPE OF WORK: Traffic Signal Plans

WILLOW CREEK DRIVE AND COLLEGE HEIGHTS
CITY OF PRESCOTT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal, Pavement Marking and Signing Plans

SCOTTSDALE ROAD AND 3RD AVENUE
CITY OF SCOTTSDALE PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Modification Plans

POWER ROAD AND WARNER ROAD
MARICOPA COUNTY PROJECT: # TT 226
SCOPE OF WORK: Traffic Signal Plans

FLORENTINE ROAD AND LAKE VALLEY ROAD
TOWN OF PRESCOTT VALLEY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

FLORENTINE ROAD AND MAIN STREET
TOWN OF PRESCOTT VALLEY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

FLORENTINE ROAD AND GLASSFORD HILL ROAD
TOWN OF PRESCOTT VALLEY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

GLASFORD HILL AND LAKESHORE DRIVE
TOWN OF PRESCOTT VALLEY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

GLASSFORD HILL ROAD AND SANTA FE LOOP
TOWN OF PRESCOTT VALLEY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

NAVAJO DRIVE AND LAKESHORE DRIVE
TOWN OF PRESCOTT VALLEY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

PAV WAY AND CENTRE COURT
TOWN OF PRESCOTT VALLEY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

CHANDLER HEIGHTS AND POWER ROAD
TOWN OF QUEEN CREEK PEOJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

^ Top

2007

SR 86 TOWN OF SELLS
ADOT PROJECT: # 086-A-NFA
SCOPE OF WORK: Pavement Marking, Signing and Traffic Control Plans

SR 88 AND 16TH AVENUE
ADOT PROJECT: # S 088-A-507
SCOPE OF WORK: Traffic Signal, Pavement Marking and Signing Plans

SR 260 AND YELLOW JACKET DRIVE
ADOT PROJECT: # 260 NA 351
SCOPE OF WORK: Traffic Signal, Pavement Marking and Signing Plans

SR 287 AND ATTAWAY ROAD
ADOT PROJECT: # 287 PN 137
SCOPE OF WORK: Traffic Signal, Pavement Marking and Signing Plans

SR 347 AND CASA BLANCA ROAD
ADOT PROJECT: # HES-347-A(200)A
SCOPE OF WORK: Traffic Signal Plans

BINGHAM AVENUE AND US HIGHWAY 95
ADOT PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

PRICE ROAD IMPROVEMENTS
CITY OF CHANDLER PROJECT: # ST 0502-201
SCOPE OF WORK: Traffic Signal Interconnect Plans

RAY ROAD AND RURAL ROAD
CITY OF CHANDLER PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Modification Plans

FOURTH STREET AND CEDAR AVENUE AT LOCKETT ROAD
CITY OF FLAGSTAFF: # 338101
SCOPE OF WORK: Traffic Signal Modification Plans

BEULAH BOULEVARD AND WOODLANDS VILLAGE
CITY OF FLAGSTAFF PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Modification Plans

BEULAH BOULEVARD AND McCONNELL DRIVE
CITY OF FLAGSTAFF: # 338101
SCOPE OF WORK: Traffic Signal Modification Plans

MCDOWELL ROAD AND PEBBLECREEK PARKWAY
CITY OF GOODYEAR PROJECT: # HTE # 06-2334
SCOPE OF WORK: Traffic Signal Plans

MCDOWELL ROAD AND BULLARD AVENUE
CITY OF GOODYEAR PROJECT: # HTE # 06-2334
SCOPE OF WORK: Traffic Signal Plans

MCDOWELL ROAD AND 145TH AVENUE
CITY OF GOODYEAR PROJECT: # HTE # 06-4115
SCOPE OF WORK: Traffic Signal Plans

MCDOWELL ROAD AND LIFETIME FITNESS DRIVEWAY
CITY OF GOODYEAR PROJECT: # HTE # 05-4103
SCOPE OF WORK: Traffic Signal Plans

MCDOWELL ROAD AND SARIVAL ROAD
CITY OF GOODYEAR PROJECT: # HTE # 06-4114
SCOPE OF WORK: Traffic Signal Plans

INDIAN SCHOOL ROAD AND SARIVAL AVENUE
CITY OF GOODYEAR PROJECT: # HTE # 07-0072
SCOPE OF WORK: Traffic Signal Plans

MCDOWELL ROAD AND 159TH AVENUE
CITY OF GOODYEAR PROJECT: # HTE # 06-2844
SCOPE OF WORK: Traffic Signal Plans

MCDOWELL ROAD AND RID CANAL
CITY OF GOODYEAR PROJECT: # HTE # 07-0068
SCOPE OF WORK: Traffic Signal Plans

PEBBLECREEK PARKWAY AND MONTE VISTA
CITY OF GOODYEAR HTE # 06-6334
SCOPE OF WORK: Traffic Signal Plans

PEBBLECREEK PARKWAY AND CORONADO
CITY OF GOODYEAR HTE # 06-6337
SCOPE OF WORK: Traffic Signal Plans

PEBBLECREEK PARKWAY AND STA. 40+92
CITY OF GOODYEAR HTE # 06-6339
SCOPE OF WORK: Traffic Signal Plans

PEBBLECREEK PARKWAY AND VIRGINIA AVENUE
CITY OF GOODYEAR HTE # 06-6336
SCOPE OF WORK: Traffic Signal Plans

MCDOWELL ROAD AND CLUBHOUSE DRIVE
CITY OF GOODYEAR HTE # 07-0071
SCOPE OF WORK: Traffic Signal Plans

INDIAN SCHOOL ROAD AND BULLARD AVENUE
CITY OF GOODYEAR HTE # 07-0295
SCOPE OF WORK: Traffic Signal Plans

INDIAN SCHOOL ROAD AND WIGWAM BOULEVARD
CITY OF GOODYEAR HTE # 07-3798
SCOPE OF WORK: Traffic Signal Plans

WIGWAM BOULEVARD AND NORTHPARK AVENUE
CITY OF GOODYEAR HTE # 07-3832
SCOPE OF WORK: Traffic Signal Plans

POWER ROAD AND BAYWOOD AVENUE
CITY OF MESA PROJECT:
SCOPE OF WORK: Traffic Signal, Pavement Marking and Signing Plans

THUNDERBIRD ROAD AND RIO VISTA BOULEVARD
CITY OF PEORIA PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

DEER VALLEY ROAD AND 51st PLACE
CITY OF PHOENIX: CSPR # 0604575
SCOPE OF WORK: Traffic Signal, Conduit and Junction Box Plans

ITS CONDUIT INFRASTRUCTURE
CITY OF SCOTTSDALE PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Interconnect Plans

SCOTTSDALE ROAD AND INDIAN BEND
CITY OF SCOTTSDALE PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

RAILROAD PARK ENTRANCE AND INDIAN BEND ROAD
CITY OF SCOTTSDALE PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

HAYDEN ROAD AND INDIAN BEND ROAD
CITY OF SCOTTSDALE PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

PIMA ROAD AND HAPPY VALLEY ROAD
CITY OF SCOTTSDALE PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

THOMPSON PEAK PARKWAY AND SCOTTSDALE HEALTHCARE DRIVE
CITY OF SCOTTSDALE PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

NORTHERN AVENUE AND ELMIRAGE
MARICOPA COUNTY PROJECT: # TT 256
SCOPE OF WORK: Traffic Signal Plans

NORTHERN AVENUE AND REEMS ROAD
MARICOPA COUNTY PROJECT: # TT 255
SCOPE OF WORK: Traffic Signal Plans

GLASSFORD HILL ROAD AND SUNDOGS AT MARKET PLACE
TOWN OF PRESCOTT VALLEY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

GLASSFORD HILL ROAD AND FLORENTINE ROAD
TOWN OF PRESCOTT VALLEY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

GLASSFORD HILL ROAD AND LAKESHORE DRIVE
TOWN OF PRESCOTT VALLEY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

SR 69 AND PRESCOTT EAST HIGHWAY
TOWN OF PRESCOTT VALLEY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

SR 69 AND STONERIDGE DRIVE
TOWN OF PRESCOTT VALLEY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Loop Replacement Plans

SR 69 AND SUNDOG CONNECTOR
TOWN OF PRESCOTT VALLEY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Loop Plans

SR 69 INTERCONNECT PLAN
TOWN OF PRESCOTT VALLEY PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Interconnect Plans

^ Top

2008

99TH AVENUE AND BELLA VILLAGIO
CITY OF GLENDALE PROJECT: # 00-XXX-000
SCOPE OF WORK: Pavement Marking Plans

SCOTTSDALE ROAD SOUTH DRAINAGE CORRIDOR IMPROVEMENTS PHASE II
CITY OF SCOTTSDALE PROJECT: BELLEVIEW STREET STORM DRAIN
SCOPE OF WORK: Traffic Control Plans

WEST DESERT HILLS DRIVE AND NORTH 7TH AVENUE
MARICOPA COUNTY PROJECT: # 00-XXX-000
SCOPE OF WORK: Pavement Marking and Signing Plans

SAN MIGUEL SITE MEXICO
PARAMOUNT GOLD AND SILVER:
SCOPE OF WORK: Geotechnical Maps

R.H. JOHNSON BOULEVARD AND SUNRISE BOULEVARD
ADOT PROJECT: # GRAND AVENUE (303L – 99th AVENUE)
SCOPE OF WORK: Traffic Signal Plans (Stage II)

REEMS ROAD AND MEEKER BOULEVARD
ADOT PROJECT: # GRAND AVENUE (303L – 99th AVENUE)
SCOPE OF WORK: Traffic Signal Plans (Stage II)

US 60 AND PARKVIEW PLACE
ADOT PROJECT: # GRAND AVENUE (303L – 99th AVENUE)
SCOPE OF WORK: Traffic Signal Plans (Stage II)

US 60 AND MOUNTAIN VIEW BOULEVARD
ADOT PROJECT: # GRAND AVENUE (303L – 99th AVENUE)
SCOPE OF WORK: Traffic Signal Plans (Stage II)

US 60 AND LITCHFIELD ROAD
ADOT PROJECT: # GRAND AVENUE (303L – 99th AVENUE)
SCOPE OF WORK: Traffic Signal Plans (Stage II)

US 60 AND TOWN CENTER DRIVE
ADOT PROJECT: # GRAND AVENUE (303L – 99th AVENUE)
SCOPE OF WORK: Traffic Signal Plans (Stage II)

US 60 AND BELL ROAD
ADOT PROJECT: # GRAND AVENUE (303L – 99th AVENUE)
SCOPE OF WORK: Traffic Signal Plans (Stage II)

US 60 AND NORTH BELL GRANDE BOULEVARD
ADOT PROJECT: # GRAND AVENUE (303L – 99th AVENUE)
SCOPE OF WORK: Traffic Signal Plans (Stage II)

US 60 AND DYSART ROAD
ADOT PROJECT: # GRAND AVENUE (303L – 99th AVENUE)
SCOPE OF WORK: Traffic Signal Plans (Stage II)

US 60 AND GREENWAY ROAD
ADOT PROJECT: # GRAND AVENUE (303L – 99th AVENUE)
SCOPE OF WORK: Traffic Signal Plans (Stage II)

US 60 AND PRIMROSE STREET
ADOT PROJECT: # GRAND AVENUE (303L – 99th AVENUE)
SCOPE OF WORK: Traffic Signal Plans (Stage II)

US 60 AND THUNDERBIRD ROAD
ADOT PROJECT: # GRAND AVENUE (303L – 99th AVENUE)
SCOPE OF WORK: Traffic Signal Plans (Stage II)

US 60 AND 113th AVENUE
ADOT PROJECT: # GRAND AVENUE (303L – 99th AVENUE)
SCOPE OF WORK: Traffic Signal Plans (Stage II)

US 60 AND 111th AVENUE
ADOT PROJECT: # GRAND AVENUE (303L – 99th AVENUE)
SCOPE OF WORK: Traffic Signal Plans (Stage II)

US 60 AND 107th AVENUE
ADOT PROJECT: # GRAND AVENUE (303L – 99th AVENUE)
SCOPE OF WORK: Traffic Signal Plans (Stage II)

US 60 AND 103rd AVENUE
ADOT PROJECT: # GRAND AVENUE (303L – 99th AVENUE)
SCOPE OF WORK: Traffic Signal Plans (Stage II)

US 60 AND 99TH AVENUE
ADOT PROJECT: # GRAND AVENUE (303L – 99th AVENUE)
SCOPE OF WORK: Traffic Signal Plans (Stage II)

US 60 AND 103rd AVENUE
ADOT PROJECT: # GRAND AVENUE (303L – 99th AVENUE)
SCOPE OF WORK: Traffic Signal Plans (Stage II)

^ Top

2009

ADOT TRAFFIC SIGNAL AND LIGHTING STANDARD DRAWINGS
ADOT PROJECT: # In-house
SCOPE OF WORK: Revamp the Entire Traffic Signal and Lighting Standard Drawings (200+ Drawings)

PIMA ROAD AND INDIAN BEND ROAD
ADOT PROJECT: # 00-XXX-000
SCOPE OF WORK: St Nick’s Traffic Control Plans

WESTERN OIL COMPANY EXPANSION
WESTERN OIL PROJECT: CALIFORNIA FIELD
SCOPE OF WORK: Geotechnical, Oil Well Location Site Maps

I-10 DMS – MP 361.00 TO MP 362.00 AND E. Bowie TRAFFIC INTERCHANGE
ADOT PROJECT: # RSIP 010-F(2) 202
SCOPE OF WORK: Dust Monitoring System and Signing Plans

^ Top

2010

ADOT TRAFFIC ENGINEERING CADD STANDARDS
ADOT PROJECT: # In-house
SCOPE OF WORK: Developed the Traffic Signal and Lighting Electronic CADD Standard (tsl.cel)

ADOT TRAFFIC ENGINEERING CADD STANDARDS
ADOT PROJECT: # In-house
SCOPE OF WORK: Developed all new CADD (FONT 36) for Traffic Engineering Plans

CAREFREE HIGHWAY – HAPPY VALLEY TO JOMAX ROAD
ADOT MPD PROJECT: 017-A(203)N
SCOPE OF WORK: Loop Detector Traffic Counter Plans

CAREFREE HIGHWAY – JOMAX ROAD TO DIXILETA DRIVE.
ADOT MPD PROJECT: 017-A(203)N
SCOPE OF WORK: Loop Detector Traffic Counter Plans

CAREFREE HIGHWAY – DIXILETA DRIVE TO SONORAN DESERT DRIVE
ADOT MPD PROJECT: 017-A(203)N
SCOPE OF WORK: Loop Detector Traffic Counter Plans

CAREFREE HIGHWAY – SONORAN DESERT DRIVE TO SONORAN BOULEVARD
ADOT MPD PROJECT: 017-A(203)N
SCOPE OF WORK: Loop Detector Traffic Counter

CAREFREE HIGHWAY – SONORAN BOULEVARD TO CAREFREE
ADOT MPD PROJECT: 017-A(203)N
SCOPE OF WORK: Loop Detector Traffic Counter plans

CITY OF TEMPE STANDARD DRAWINGS
TEMPE PROJECT: # 00-XXX-000
SCOPE OF WORK: Modular Traffic Signal Standard Drawings

OLENE GAP
PARAMOUNT GOLD AND SILVER:
SCOPE OF WORK: Geotechnical Maps

75TH AVENUE AND GOLDEN AVENUE
CITY OF PEORIA PROJECT: # 00-XXX-000
SCOPE OF WORK: Fiber Diagrams and Assignment Tables

^ Top

2011

SR 77 AND EAGLE CREST RANCH BOULEVARD
ADOT PROJECT: # 077-A(203)A
SCOPE OF WORK: Traffic Signal, Pavement Marking and Signing Plans

SR 101L, SR 101L, I-10 TO TATUM BOULEVARD
ADOT MPD PROJECT: # 101-A(208)N)
SCOPE OF WORK: Loop Detector Traffic Counter Plans

ADOT TRAFFIC ENGINEERING STANDARD DRAWINGS
ADOT PROJECT: # In-house
SCOPE OF WORK: Developed Numerous Signing and Marking Standard Drawings

ADOT TRAFFIC ENGINEERING STANDARD DRAWINGS
ADOT PROJECT: # In-house
SCOPE OF WORK: Developed Numerous Local Government Standard Drawings

ADOT TRAFFIC ENGINEERING STANDARD DRAWINGS
ADOT PROJECT: # In-house
SCOPE OF WORK: Develop Copper Cable Theft Security Pull Box Standard Drawings

ADOT TRAFFIC ENGINEERING STANDARD DRAWINGS
ADOT PROJECT: # In-house
SCOPE OF WORK: Develop New Span Wire Traffic Signal Standard Drawings

75TH AVENUE AND CACTUS ROAD
CITY OF PEORIA PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Modification Plans

89TH AVENUE AND UNION HILLS
CITY OF PEORIA PROJECT: # 00-XXX-000
SCOPE OF WORK: Traffic Signal Plans

OLIVE AVENUE FROM LITCHFIELD ROAD TO LOOP 101 ITS
MARICOPA COUNTY PROJECT: # TT292
SCOPE OF WORK: Intelligent Transportation System Plans

McDOWELL ROAD – SR 101L TO ALMA SCHOOL
MARICOPA COUNTY PROJECT: # TT290
SCOPE OF WORK: Intelligent Transportation System and Traffic Signal Plans

83rd AVENUE AT BUTLER DRIVE AND OLIVE AVENUE
CITY OF PEORIA: EN 00313
SCOPE OF WORK: Traffic Signal, ITS and Traffic Signal Demo Plans

^ Top

2012

PEDESTRIAN HYBRID BEACON (PHB) TYPICAL LAYOUT
ADOT PROJECT: # In-House
SCOPE OF WORK: Pedestrian Hybrid Beacon Standard Drawings

GILA COUNTY VARIOUS RURAL ROADS PAVEMENT MARKING
ADOT PROJECT: # HRRRP-GGI-0(209)T
SCOPE OF WORK: Pavement Marking Plans and Special Marking Details

PEDESTRIAN COUNTDOWN SIGNAL HEADS – PHOENIX DISTRICT – VARIOUS LOCATIONS
ADOT PROJECT: # 888-A(214)A
SCOPE OF WORK: Location, Push Button, PPB Sign and PED Signal Summary

SR 95 AND SILVER CREEK ROAD IN BULLHEAD CITY
ADOT PROJECT: # HSIP 095-D(205)T
SCOPE OF WORK: Traffic Signal Modification Plans

LAST UPDATE JULY, 2012